Scrap Material | Location | Average Price | High Price | Low Price | Price Unit | Updated |
---|---|---|---|---|---|---|
6063 Aluminum | Tulsa | 0.73 | 0.73 | 0.73 | USD/LB | 4/20/2024 |
Aluminum Cast | Tulsa | 0.42 | 0.42 | 0.42 | USD/LB | 4/20/2024 |
Aluminum Coolers | Tulsa | 0.44 | 0.44 | 0.44 | USD/LB | 4/20/2024 |
Aluminum MLC Clips | Tulsa | 0.62 | 0.62 | 0.62 | USD/LB | 4/20/2024 |
6061 Aluminum | Tulsa | 0.62 | 0.62 | 0.62 | USD/LB | 4/20/2024 |
Aluminum Painted Siding | Tulsa | 0.63 | 0.63 | 0.63 | USD/LB | 4/20/2024 |
Aluminum Sheet | Tulsa | 0.57 | 0.57 | 0.57 | USD/LB | 4/20/2024 |
Aluminum Wheels Clean | Tulsa | 0.74 | 0.74 | 0.74 | USD/LB | 4/20/2024 |
Irony Aluminum | Tulsa | 0.42 | 0.42 | 0.42 | USD/LB | 4/20/2024 |
Red Brass | Tulsa | 2.92 | 2.92 | 2.92 | USD/LB | 4/20/2024 |
Yellow Brass | Tulsa | 2.41 | 2.41 | 2.41 | USD/LB | 4/20/2024 |
#1 Copper | Tulsa | 3.7 | 3.7 | 3.7 | USD/LB | 4/20/2024 |
#2 Copper | Tulsa | 3.54 | 3.54 | 3.54 | USD/LB | 4/20/2024 |
#2 Insulated Copper Wire 40% Recovery | Tulsa | 1.14 | 1.14 | 1.14 | USD/LB | 4/20/2024 |
Insulated Copper Wire 50% Recovery | Tulsa | 2.28 | 2.28 | 2.28 | USD/LB | 4/20/2024 |
Cast Iron | Tulsa | 70 | 70 | 70 | USD/NT | 4/20/2024 |
Lead | Tulsa | 0.6 | 0.6 | 0.6 | USD/LB | 4/20/2024 |
304 Stainless Steel | Tulsa | 0.34 | 0.34 | 0.34 | USD/LB | 4/20/2024 |
#1 Prepared | Tulsa | 230 | 230 | 230 | USD/NT | 4/20/2024 |
#1 Unprepared | Tulsa | 200 | 200 | 200 | USD/NT | 4/20/2024 |
#2 Prepared | Tulsa | 200 | 200 | 200 | USD/NT | 4/20/2024 |
#2 Unprepared | Tulsa | 180 | 180 | 180 | USD/NT | 4/20/2024 |
Shred/Tin | Tulsa | 150 | 150 | 150 | USD/NT | 4/20/2024 |
AC compressors | Afton | 0.15 | 0.15 | 0.15 | USD/LB | 4/05/2024 |
Al/Cu Reefers | Afton | 1.7 | 1.7 | 1.7 | USD/LB | 4/05/2024 |
Al/Cu Reefers w/ Fe | Afton | 0.7 | 0.7 | 0.7 | USD/LB | 4/05/2024 |
Aluminum Breakage | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Aluminum Cans | Afton | 0.35 | 0.35 | 0.35 | USD/LB | 4/05/2024 |
Aluminum Coolers Dirty | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Aluminum Radiators /Fe | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Aluminum Radiators | Afton | 0.3 | 0.3 | 0.3 | USD/LB | 4/05/2024 |
Aluminum | Afton | 0.3 | 0.3 | 0.3 | USD/LB | 4/05/2024 |
Aluminum Semi Truck Wheels | Afton | 0.3 | 0.3 | 0.3 | USD/LB | 4/05/2024 |
Aluminum Sheet Dirty | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Brass Radiator /Fe | Afton | 0.6 | 0.6 | 0.6 | USD/LB | 4/05/2024 |
Brass Radiator | Afton | 1.1 | 1.1 | 1.1 | USD/LB | 4/05/2024 |
Brass Clean | Afton | 2.25 | 2.25 | 2.25 | USD/LB | 4/05/2024 |
Brass Turning (clean) | Afton | 1.3 | 1.3 | 1.3 | USD/LB | 4/05/2024 |
#1 Copper Bare Bright | Afton | 3.4 | 3.4 | 3.4 | USD/LB | 4/05/2024 |
#1 Double Insulated Copper | Afton | 1.6 | 1.6 | 1.6 | USD/LB | 4/05/2024 |
#1 Single Insulated Copper | Afton | 2 | 2 | 2 | USD/LB | 4/05/2024 |
#2 Copper Wire Single Insulated | Afton | 1.4 | 1.4 | 1.4 | USD/LB | 4/05/2024 |
Brass Shells | Afton | 0.6 | 0.6 | 0.6 | USD/LB | 4/05/2024 |
CATV - Black | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Copper Radiators | Afton | 1.9 | 1.9 | 1.9 | USD/LB | 4/05/2024 |
Copper Radiators (Dirty) | Afton | 0.7 | 0.7 | 0.7 | USD/LB | 4/05/2024 |
Extension Cord | Afton | 0.4 | 0.4 | 0.4 | USD/LB | 4/05/2024 |
Heater Cores | Afton | 0.8 | 0.8 | 0.8 | USD/LB | 4/05/2024 |
Lead Dirty | Afton | 0.2 | 0.2 | 0.2 | USD/LB | 4/05/2024 |
Stainless Steel Breakage | Afton | 0.08 | 0.08 | 0.08 | USD/LB | 4/05/2024 |
Rebar | Afton | 100 | 100 | 100 | USD/NT | 4/05/2024 |
#1 Copper Wire Double Insulated | Afton | 1.4 | 1.4 | 1.4 | USD/LB | 3/05/2024 |
Aluminum Cast Wheels | Ardmore | 0.7 | 0.7 | 0.7 | USD/LB | 11/06/2023 |
Aluminum Wire (No coating) | Ardmore | 0.6 | 0.6 | 0.6 | USD/LB | 11/06/2023 |
Magnesium Clean | Ardmore | 0.1 | 0.1 | 0.1 | USD/LB | 11/06/2023 |
Brass Water Meter | Ardmore | 2 | 2 | 2 | USD/LB | 11/06/2023 |
#3 Insulated Copper Wire | Ardmore | 0.21 | 0.21 | 0.21 | USD/LB | 11/06/2023 |
Floppy/CD Drive | Ardmore | 0.04 | 0.04 | 0.04 | USD/LB | 11/06/2023 |
Power Supply W/Cord | Ardmore | 0.1 | 0.1 | 0.1 | USD/LB | 11/06/2023 |
Steel Turnings | Ardmore | 7 | 7 | 7 | USD/CWT | 11/06/2023 |
#1 Prepared | Tulsa | 210 | 210 | 210 | USD/NT | 10/20/2023 |
Copper Contents | Ardmore | 0.1 | 0.1 | 0.1 | USD/LB | 10/05/2023 |
Aluminum Transmissions | Chouteau | 0.09 | 0.09 | 0.09 | USD/LB | 9/20/2023 |
Aluminum Wheels Dirty | Chouteau | 0.65 | 0.65 | 0.65 | USD/LB | 9/20/2023 |
Mixed Brass Turnings | Chouteau | 0.6 | 0.6 | 0.6 | USD/LB | 9/20/2023 |
Cellular Phones | Chouteau | 0.45 | 0.45 | 0.45 | USD/LB | 9/20/2023 |
Hard Drives | Chouteau | 0.1 | 0.1 | 0.1 | USD/LB | 9/20/2023 |
HARD DRIVES W/BOARDS | Chouteau | 0.4 | 0.4 | 0.4 | USD/LB | 9/20/2023 |
High Grade Board | Chouteau | 3 | 3 | 3 | USD/LB | 9/20/2023 |
Laptops | Chouteau | 0.55 | 0.55 | 0.55 | USD/LB | 9/20/2023 |
Low Grade Boards | Chouteau | 0.15 | 0.15 | 0.15 | USD/LB | 9/20/2023 |
Motherboards | Chouteau | 1.5 | 1.5 | 1.5 | USD/LB | 9/20/2023 |
Power Supplies | Chouteau | 0.15 | 0.15 | 0.15 | USD/LB | 9/20/2023 |
Range Lead | Chouteau | 0.3 | 0.3 | 0.3 | USD/LB | 9/20/2023 |
Steel Case Batteries | Chouteau | 0.06 | 0.06 | 0.06 | USD/LB | 9/20/2023 |