Material
Location

Current Scrap Metal Prices in Toano, Virginia

The prices listed below are paid by the scrap yards in Toano.
Aluminum ScrapCity Average
Updated on 1/27/2026
0.34 USD/LB
Brass ScrapCity Average
Updated on 1/27/2026
1.35 USD/LB
Copper ScrapCity Average
Updated on 1/27/2026
1.22 USD/LB
Scrap MaterialAverage PriceHigh PriceLow PricePrice UnitUpdated
Lead0.250.250.25USD/LB1/27/2026
Brass Shells0.650.650.65USD/LB1/27/2026
Copper Aluminum AC Coils (Clean)1.751.751.75USD/LB1/27/2026
Copper Aluminum AC Coils (Unclean)1.251.251.25USD/LB1/27/2026
Copper Electric Motors0.200.200.20USD/LB1/27/2026
Cu/Brass Radiator1.601.601.60USD/LB1/27/2026
Harness Wire0.750.750.75USD/LB1/27/2026
Unclean Cu/Brass Radiator0.900.900.90USD/LB1/27/2026
Xmas Lights0.100.100.10USD/LB1/27/2026
Lead Batteries0.200.200.20USD/LB1/27/2026
Aluminum Cans0.350.350.35USD/LB1/27/2026
Lead Wheel Weights0.100.100.10USD/LB1/27/2026
Steel Case Batteries0.180.180.18USD/LB1/27/2026
Stainless Steel0.300.300.30USD/LB1/27/2026
Stainless Steel Unclean0.090.090.09USD/LB1/27/2026
Drums and Rotors0.100.100.10USD/LB1/27/2026
HMS Prepared0.060.060.06USD/LB1/27/2026
HMS Unprepared0.040.040.04USD/LB1/27/2026
Light Iron0.060.060.06USD/LB1/27/2026
#3 Insulated Copper Wire0.300.300.30USD/LB1/27/2026
Aluminum Car Rims0.500.500.50USD/LB1/27/2026
Aluminum Radiators /Fe0.200.200.20USD/LB1/27/2026
Aluminum Radiators0.300.300.30USD/LB1/27/2026
Aluminum0.400.400.40USD/LB1/27/2026
Aluminum Dirty0.200.200.20USD/LB1/27/2026
Aluminum Siding0.400.400.40USD/LB1/27/2026
Chrome Wheels0.400.400.40USD/LB1/27/2026
E.C. Aluminum Wire0.400.400.40USD/LB1/27/2026
Insulated Aluminum Wire0.200.200.20USD/LB1/27/2026
Brass Clean1.751.751.75USD/LB1/27/2026
Brass Dirty0.950.950.95USD/LB1/27/2026
#1 Copper3.803.803.80USD/LB1/27/2026
#1 Insulated Copper Wire1.551.551.55USD/LB1/27/2026
#2 Copper3.703.703.70USD/LB1/27/2026
#2 Insulated Copper Wire0.400.400.40USD/LB1/27/2026
Alternator0.200.200.20USD/LB1/27/2026
Romex 65% Copper Wire1.551.551.55USD/LB9/29/2025
Steel compressors sealed units scrap0.150.150.15USD/LB9/29/2025
Al/Cu Radiators Ends0.450.450.45USD/LB9/29/2025
#1 HMS Prepared0.070.070.07USD/LB1/20/2023
#1 HMS Unprepared0.070.070.07USD/LB1/20/2023
#1 Copper Wire1.351.351.35USD/LB10/17/2022
Cu/Al Radiator Ends0.450.450.45USD/LB8/22/2022
Light Iron0.060.060.06USD/LB8/22/2022

Scrap Yards in Virginia