Material
Location

Current Scrap Metal Prices in Inver Grove Heights, Minnesota

The prices listed below are paid by the scrap yards in Inver Grove Heights.
Aluminum ScrapCity Average
Updated on 11/14/2025
0.60 USD/LB
Brass ScrapCity Average
Updated on 11/14/2025
2.27 USD/LB
Copper ScrapCity Average
Updated on 11/14/2025
2.23 USD/LB
Scrap MaterialAverage PriceHigh PriceLow PricePrice UnitUpdated
High Grade Board3.203.203.20USD/LB11/14/2025
#2 Copper Pipe3.753.753.75USD/LB11/14/2025
Bare Bright Copper4.004.004.00USD/LB11/14/2025
Copper Transformer0.300.300.30USD/LB11/14/2025
Cu/Al Radiators /Fe1.901.901.90USD/LB11/14/2025
Cu/Al Radiators2.002.002.00USD/LB11/14/2025
Electric Motors0.220.220.22USD/LB11/14/2025
Romex 65% Copper Wire2.302.302.30USD/LB11/14/2025
Unclean Cu/Brass Radiator1.001.001.00USD/LB11/14/2025
Hard Drives0.400.400.40USD/LB11/14/2025
Cu/Brass Radiator2.402.402.40USD/LB11/14/2025
Medium Grade Boards0.700.700.70USD/LB11/14/2025
Power Supplies0.200.200.20USD/LB11/14/2025
Silver Memory4.004.004.00USD/LB11/14/2025
Auto Batteries0.200.200.20USD/LB11/14/2025
Lead0.500.500.50USD/LB11/14/2025
Lead Wheel Weights0.200.200.20USD/LB11/14/2025
#1 Prepared185.00185.00185.00USD/Ton11/14/2025
#2 Prepared185.00185.00185.00USD/Ton11/14/2025
#1 Copper Pipe3.953.953.95USD/LB11/14/2025
Aluminum Breakage0.250.250.25USD/LB11/14/2025
Aluminum Cast0.680.680.68USD/LB11/14/2025
Aluminum Pop Cans0.700.700.70USD/LB11/14/2025
Aluminum Semi Rims0.650.650.65USD/LB11/14/2025
Aluminum Sheet0.660.660.66USD/LB11/14/2025
Aluminum Siding0.700.700.70USD/LB11/14/2025
Aluminum Turning0.250.250.25USD/LB11/14/2025
Extruded Aluminum0.880.880.88USD/LB11/14/2025
Red Brass3.203.203.20USD/LB11/14/2025
Yellow Brass2.502.502.50USD/LB11/14/2025
Yellow Brass Unclean1.101.101.10USD/LB11/14/2025
#1 Insulated Copper Wire 75% Recovery2.752.752.75USD/LB11/14/2025
Hard Drive Boards0.400.400.40USD/LB9/26/2025
#1 Unprepared150.00150.00150.00USD/Ton9/26/2025
Aluminum Auto Wheels1.001.001.00USD/LB9/26/2025
#1 UnPrepared150.00150.00150.00USD/Ton8/04/2025
#1 Low Grade Motherboard0.500.500.50USD/LB8/04/2025
Low Grade Boards0.250.250.25USD/LB3/27/2025
#1 Unprepared135.00135.00135.00USD/Ton11/23/2024
Semi Wheel Aluminum0.500.500.50USD/LB10/08/2024
#1 Mid Grade Board0.700.700.70USD/LB10/08/2024
Insulated Copper Wire 65% recovery1.651.651.65USD/LB11/20/2023
Al/Cu Radiators1.801.801.80USD/LB2/20/2023
Al/Cu Radiators /Fe1.551.551.55USD/LB2/20/2023
#2 Copper Wire0.900.900.90USD/LB10/17/2022
Aluminum Breakage Dirty0.200.200.20USD/LB10/17/2022
High Grade ICW2.702.702.70USD/LB10/17/2022
#1 Prepared170.00170.00170.00USD/Ton8/22/2022
#1 Cast Iron215.00215.00215.00USD/Ton8/05/2022
Aluminum Extrusion0.700.700.70USD/LB8/12/2021
HG Motherboards2.702.702.70USD/LB8/12/2021
Aluminum Car Rims0.680.680.68USD/LB3/05/2018
Romex Wire1.401.401.40USD/LB3/05/2018

Scrap Yards in Inver Grove Heights