SEATTLE (Scrap Monster): Recycle BC has announced construction of a new materials recovery facility (MRF), in partnership with Miller Waste Systems, Orion Construction and Astria Properties. The project is expected to strengthen the province’s recycling network by incorporating state-of-the-art processing techniques.
Key Points
- Recycle BC is developing a new MRF in Delta, British Columbia, with Miller Waste Systems, Orion Construction and Astria Properties.
- The facility will process 120,000 tonnes of residential packaging and paper annually.
- The 145,000-square-foot facility is scheduled to become operational in 2028.
- The project includes provisions for future capacity expansion.
- Advanced optical sorting and AI-assisted technologies will improve sorting accuracy and material recovery.
- The facility will handle both single-stream and multistream recyclables.
- Nearly all processing equipment will be sourced from Canadian manufacturers.
- The project is expected to create up to 200 jobs, including 60–70 permanent positions.
The facility, located in in Delta, British Columbia, will be capable of processing 120,000 tonnes of residential packaging and paper per year. The development is part of Recycle BC’s planned expansion of its investment in regional recycling infrastructure.
The 145,000-square-foot facility, located at 9336 River Road, is expected to become operational in 2028. The project has provisions for future processing capacity expansion.
Miller Waste Systems will oversee facility design, construction and operations, while Orion Construction serves as construction partner. Astria Properties is responsible for development management, design coordination and permitting. Nearly all processing equipment will be sourced from Canadian manufacturers.
The facility will incorporate advanced optical sorting and artificial intelligence-assisted technologies to improve material separation, sorting accuracy and recovery rates. The processing systems will accommodate both single-stream and multistream recyclables, a news release said.
Construction and operational activities are expected to generate up to 200 jobs, including approximately 60–70 permanent positions.
ALSO READ:
Maine Hampden Recycling Facility Restarts, Handles 600 Tons Daily
MRF Automation ROI: Are Multimillion-Dollar Upgrades Paying Off?
RecyclingMonster Edge
What Makes This Facility Unique?
The facility features a dedicated 1,000-square-foot education space.
The education space, designed to promote recycling awareness and public engagement, is expected to offer visitors an opportunity to learn about the recycling process, how collected packaging and paper are sorted and recovered, and the role of modern technologies in material recovery.
Through educational activities and facility-related learning experiences, it could help strengthen public understanding of recycling systems, encourage responsible waste disposal practices and highlight the importance of keeping recyclable materials out of landfills.
Editor’s Note
Industry Background: Recycling in British Columbia
Key statistics:
- 208,484 tonnes – Net tonnes collected in 2024.
- 83.3% – Overall recovery rate in 2024.
- 99.5% – Approximate share of BC households with access to recycling services.
- 99%+ – Plastics managed by recycling sent to recycling end markets in British Columbia.
Sources: Recycle BC 2024 Annual Report and program performance reporting.